Project Highlight At a prominent confectionery site in York, Newsome has commissioned a efficient 400 kW chiller, marking the successful conclusion of the project. Designed to advance ESG targets, the installation enhances system dependability while minimising overall power consumption and CO₂ levels. https://sb-bookmarking.com/story20805244/energy-efficient-400-kw-chiller-installation-achieves-50-000-yearly-energy-savings-and-200-metric-tonnes-co%E2%82%82-cut