Evaluate the space from the ground for the joists at a number of locations and build your wall at the very least one/4 in. shorter compared to the shortest measurement. Trying to drive a wall into put can increase the joists, which could wreak havoc with drywall joints and flooring https://josuewyurn.blog5.net/77601007/the-best-side-of-basement-finishing-contractors