Once the project is full and handovered on the operator, the contractor specifies a warranty period of time. Inside this period, any defects located in building constructed has to be fastened and replaced with the contractor in charge. The guarantee for materials and appliances are received from producers and suppliers. https://pantip59269.idblogmaker.com/29721080/the-ultimate-guide-to-construction-services